|
Foundation Problems? |
||||||||||||||||||
|
Branlows specialise in providing solutions to foundation problems piling, drilling, grouting and ground anchors. Our mini piling expertise helps overcome difficult operational conditions including restricted access, low and limited headroom, environmental restrictions and difficult ground. Over the years, we have been involved with many national and international companies in providing expertise and practical knowledge. Branlows was formed in 1981 and for the past two decades has been involved with many national and international organisations in providing expertise and knowledge to find answers to a multitude of foundation problems. Our Engineers will investigate a problem, review the limitations and options, recommend what action to take and then implement it. The company is always willing to discuss which foundation methods may be appropriate to your particular foundation problems. We believe our respected name is founded on impressive project management experience, highly skilled engineers, a quality management system to ISO 9001 and expert product knowledge. This goes together with a first class service, a strict and professional health and safety system which meets CDM regulations and by keeping up-to-date with equipment and geotechnical developments. We have in-house chartered engineers who can provide a complete design package for clients. The result is a top quality job and satisfied customers. We give practical and realistic advice to a multitude of clients - engineers, builders and civil engineering contractors, developers, commercial and industrial companies. Our expertise is in driven, augered and drilled piling and grouting, stabilising of mineral workings and slabs, ground anchors and soil nails. Within this site you will see some of the high quality equipment we own and use and the varied work we can undertake in different sectors. Quality Assured In 1992 Branlows became the first mini piling contractor in the UK to achieve ISO 9001. This assures clients that procedures covering all our company's specialist activities are in place to ensure a high quality of work. Our system is regularly audited by the BSI.
Training : We have a directly employed workforce who are fully trained and certified to CITB standards, conforming with current CITB regulations. We are also proud to be assisting the Construction Industry Training Board in the development of a recognised NVQ for our specialist sector. In 1997 Branlows was approached by the CITB to help develop specific areas of operative training. We have assisted with the development of NVQ levels 2 and 3 in underpinning and piling. 20 mini piling operatives were placed on a training programme involving regular appraisals and assessment against a profile developed jointly by Branlows and the CITB. This year our personnel have been the first in the UK to achieve an NVQ level 2 training standard for minipiling. We also undertake in-house training at Branlows through weekly tool box talks and specifically arranged seminars, both on and off the premises, covering topics such as welding/burning, materials handling and Health and Safety. Tool box talks are often held on-site so that trainees gain hands on experience. Our close links with the CITB has established Branlows at the forefront of employee training and commitment to personnel development. Partnerships : Branlows believe it is our pro-active approach with clients, engineers and main contractors, together with our expertise in both design and construction, which enables us to devise economical solutions to a multitude of foundation problems. As part of our commitment to our clients, we produce a Branlows Bulletin periodically throughout the year, keeping you informed of our recent commissions and projects, which reflect our diversity and skill. Refurbishment : Clients
are demanding more and more from their existing facilities which often
results in the
Branlows undertake work in the following areas drilled mini piling : restricted access piling : subsidence remediation : limited headroom piling : auger bored mini piling : auger piled foundations : bottom driven drop hammer piling : drilled and rock socketed piling : foundation piles : foundation upgrades : piled foundations
|
||||||||||||||||||
![]()
General Information
Auger bored mini piles
Klemm 500 standard drilling processes
Home
Contact
Underpinning and mini piling contractors capital investment
Completed Contracts
Drilled mini piling
Auger bored mini piling
Auger bored piles British Aerospace
Piled foundation upgrades and foundation piles
Restricted access piled foundations
Foundation subsidence
Bottom driven drop hammer piles
Bottom driven piling Viaduct Bridge renewal
Drilled and rock socketed piling
Rock socket, retaining wall
Limited headroom piling
Technical Data Sheets
Auger bored system
Restricted access bottom driven drop hammer system
Limited headroom drilled mini piling system